Course outline
- Course overview
- Please submit your email here to begin the course.
- Lesson 1: Types of air monitors
- Lesson 2: What are calibration and collocation?
- Lesson 3: How do I find a reference site?
- Lesson 4: Clarity Node-S Deployment for Collocation
- Lesson 5: Collocation and calibration checklist
- Lesson 6: Complete the questionnaire
Lesson 4: Clarity Node-S Deployment for Collocation
Once you have confirmed the start date of your collocation with the agency, you can start planning for device sensor deployment. The Clarity Node-S Deployment Guide will help you determine how to properly install your monitors at the reference site. Please read through the Deployment Guide for a full walkthrough of installing your Clarity device(s).
By the end of this lesson, you’ll understand:
- How and when to deploy your Clarity devices for collocation at the reference site.
- What information you should share with your Clarity contact after collocating.
Guidance on Clarity Node-S Setup at Collocation Site |
|
Recommendations |
Cautions |
|
|
Once the devices are set up at the collocation site, send your Clarity Environmental Project Manager the following information:
-
The date and time the device(s) were installed.
-
The reference site name.
-
Photos of your Clarity device(s) at the reference site.
-
If the data are not available via AirNow, EEA, or OpenAQ, confirm can send a .csv file of the data including the following:
-
the time zone the data are reported in
-
the units the data are reported in (ppb vs ug/m3)
-
if the data are averaged, whether they are begin-time (e.g. the 3:00 measurement includes data from 3:00-3:59) or end-time (3:00 includes 2:01-3:00) averages
-
Any info about error codes or quality assurance flags included in the dataset
-
Other learning resources: EPA Air Sensor Collocation Instruction Guide